Drainage works will take place at Stoke Road, Martock between 12.06.23. and 14.07.23. A new drainage pipe will be installed along the centre line of the road along the length of the 30mph restricted area.
This is likely to mean a total closure of the road, with access only for residents, with diversion routes being signed. Access to Martock workspace is available from the A303. Martock Recreational Ground from is still accessible from Stoke Road.
Full details regarding vehicular access to Martock Workspace and the Recreation Ground, together with the diversion routes will be available in two weeks’ time.